<?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom">
<channel>
  <atom:link href="https://www.elehpd.com/feed.xml" rel="self" type="application/rss+xml" />
  <title>ELEHPD Buyer Guides</title>
  <link>https://www.elehpd.com/blog</link>
  <description>Practical selection and specification guides for low voltage electrical components, industrial control gear and lighting.</description>
  <language>en</language>
  <lastBuildDate>Fri, 25 Sep 2026 00:00:00 +0000</lastBuildDate>
  <generator>ELEHPD</generator>
    <item>
      <title>Control Relay Selection: Coil Voltage &amp; Contact Rating</title>
      <link>https://www.elehpd.com/blog/relay-selection-guide</link>
      <guid isPermaLink="true">https://www.elehpd.com/blog/relay-selection-guide</guid>
      <description>How to choose a control relay: coil voltage (AC/DC), contact rating, 8-pin vs 11-pin sockets, and electromagnetic vs solid-state for panel builders.</description>
      <pubDate>Mon, 28 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Terminal Block Sizing: Current, Creepage and How to Choose</title>
      <link>https://www.elehpd.com/blog/terminal-block-sizing-guide</link>
      <guid isPermaLink="true">https://www.elehpd.com/blog/terminal-block-sizing-guide</guid>
      <description>How to size a terminal block: current rating, cross-section, creepage and clearance, and DIN-rail vs PCB types for panels and control gear.</description>
      <pubDate>Sun, 27 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>How to Choose a 24V DC Switching Power Supply (DIN-rail)</title>
      <link>https://www.elehpd.com/blog/switching-power-supply-24v-selection</link>
      <guid isPermaLink="true">https://www.elehpd.com/blog/switching-power-supply-24v-selection</guid>
      <description>Choosing a DIN-rail switch-mode power supply: wattage headroom, 24V vs 12V, single-phase vs three-phase, and protection for control panels.</description>
      <pubDate>Sun, 27 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Motor Protection Circuit Breaker vs MCB: Protecting a Motor Properly</title>
      <link>https://www.elehpd.com/blog/motor-protector-vs-mcb</link>
      <guid isPermaLink="true">https://www.elehpd.com/blog/motor-protector-vs-mcb</guid>
      <description>Why a motor needs a motor protection circuit breaker (MPCB): starting current, overload and phase-failure protection that a plain MCB cannot give.</description>
      <pubDate>Sun, 27 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Surge Protection for Panels: Type 1 / 2 / 3 and Where to Place Them</title>
      <link>https://www.elehpd.com/blog/surge-protection-panel-guide</link>
      <guid isPermaLink="true">https://www.elehpd.com/blog/surge-protection-panel-guide</guid>
      <description>How to choose an SPD / surge arrester: Class I, II and III, where each goes in a panel, and why it needs a backup fuse.</description>
      <pubDate>Sun, 27 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>AC Contactor Selection: AC-1, AC-3 and AC-4 Utilization Categories</title>
      <link>https://www.elehpd.com/blog/contactor-ac1-ac3-ac4-selection</link>
      <guid isPermaLink="true">https://www.elehpd.com/blog/contactor-ac1-ac3-ac4-selection</guid>
      <description>How to choose an AC contactor: utilization categories AC-1/AC-3/AC-4, coil voltage, and why the same contactor has different ratings.</description>
      <pubDate>Sun, 27 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>MCCB vs MCB: When to Step Up to Molded Case Protection</title>
      <link>https://www.elehpd.com/blog/mccb-vs-mcb-selection</link>
      <guid isPermaLink="true">https://www.elehpd.com/blog/mccb-vs-mcb-selection</guid>
      <description>When a molded case circuit breaker (MCCB) beats a miniature (MCB): higher current, adjustable trips, and selective coordination.</description>
      <pubDate>Sun, 27 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>RCCB vs RCBO vs ELCB: Which Residual Current Device Do You Need</title>
      <link>https://www.elehpd.com/blog/rcbo-vs-rccb-vs-elcb</link>
      <guid isPermaLink="true">https://www.elehpd.com/blog/rcbo-vs-rccb-vs-elcb</guid>
      <description>RCCB, RCBO and ELCB explained: how they differ, when to use a combined RCBO, and Type AC / A / F / B for modern loads.</description>
      <pubDate>Sun, 27 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>How to Size an MCB to Cable and Load Current</title>
      <link>https://www.elehpd.com/blog/mcb-cable-sizing-guide</link>
      <guid isPermaLink="true">https://www.elehpd.com/blog/mcb-cable-sizing-guide</guid>
      <description>The practical rule for sizing a miniature circuit breaker: Ib ≤ In ≤ Iz, cable derating, and picking the trip type for the load.</description>
      <pubDate>Sun, 27 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Fuse Selection Guide: How to Size a Fuse for a Circuit</title>
      <link>https://www.elehpd.com/blog/fuse-selection-guide</link>
      <guid isPermaLink="true">https://www.elehpd.com/blog/fuse-selection-guide</guid>
      <description>How to size a fuse: gG vs aR fuse characteristics, rated current and breaking capacity, and how to choose cylindrical, blade or screw-type forms.</description>
      <pubDate>Sun, 27 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>How to Size an MCCB: Molded Case Circuit Breaker Guide</title>
      <link>https://www.elehpd.com/blog/mccb-molded-case-circuit-breaker-sizing</link>
      <guid isPermaLink="true">https://www.elehpd.com/blog/mccb-molded-case-circuit-breaker-sizing</guid>
      <description>How to size a molded case circuit breaker (MCCB): frame size, breaking capacity, thermal-magnetic vs electronic trip, and pole count for panel builders.</description>
      <pubDate>Fri, 25 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Surge Protective Device Selection: Type 1, 2, 3 SPD Guide</title>
      <link>https://www.elehpd.com/blog/surge-protective-device-selection</link>
      <guid isPermaLink="true">https://www.elehpd.com/blog/surge-protective-device-selection</guid>
      <description>Choose a surge protective device (SPD): Type 1 vs Type 2 vs Type 3, voltage protection level Up, In/Imax ratings and coordination with upstream breaker.</description>
      <pubDate>Fri, 25 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>RCD vs RCBO vs RCCB: Residual Current Protection Guide</title>
      <link>https://www.elehpd.com/blog/rcd-rcbo-rccb-residual-current-protection</link>
      <guid isPermaLink="true">https://www.elehpd.com/blog/rcd-rcbo-rccb-residual-current-protection</guid>
      <description>RCD, RCBO and RCCB explained for buyers: Type AC vs Type A, 30 mA vs 100 mA/300 mA, pole configurations, and when to specify an RCBO instead of an RCD plus MCB.</description>
      <pubDate>Thu, 24 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>How to Choose a Digital Energy Meter for Sub-Metering</title>
      <link>https://www.elehpd.com/blog/how-to-choose-digital-energy-meter</link>
      <guid isPermaLink="true">https://www.elehpd.com/blog/how-to-choose-digital-energy-meter</guid>
      <description>How to pick a digital energy meter or panel meter: single vs three-phase, accuracy class, direct vs CT connection, and what to specify for sub-metering.</description>
      <pubDate>Wed, 23 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Importing Low Voltage Electrical Products from China: OEM, Compliance and Logistics</title>
      <link>https://www.elehpd.com/blog/importing-low-voltage-electrical-products-from-china</link>
      <guid isPermaLink="true">https://www.elehpd.com/blog/importing-low-voltage-electrical-products-from-china</guid>
      <description>What importers should confirm before placing a first order with a Chinese low voltage electrical manufacturer: OEM terms, compliance documents, HS classification, QC and shipping.</description>
      <pubDate>Tue, 22 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Wire Ferrules and Pre-Insulated Terminals: Sizing and Crimping Guide</title>
      <link>https://www.elehpd.com/blog/wire-ferrules-pre-insulated-terminals-sizing</link>
      <guid isPermaLink="true">https://www.elehpd.com/blog/wire-ferrules-pre-insulated-terminals-sizing</guid>
      <description>How to match wire ferrules and pre-insulated terminals to conductor size, choose the right crimp profile, and avoid the two failure modes that cause loose panel connections.</description>
      <pubDate>Mon, 21 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>LED Floodlight vs High-Bay: Choosing Warehouse and Area Lighting</title>
      <link>https://www.elehpd.com/blog/led-floodlight-vs-high-bay-warehouse</link>
      <guid isPermaLink="true">https://www.elehpd.com/blog/led-floodlight-vs-high-bay-warehouse</guid>
      <description>When a high-bay is the right choice and when a floodlight is, how to work out the lumens you actually need, and which IP and IK ratings a warehouse or yard requires.</description>
      <pubDate>Sun, 20 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Switching Power Supply Selection: Wattage, Derating and DIN-Rail Mounting</title>
      <link>https://www.elehpd.com/blog/switching-power-supply-selection-guide</link>
      <guid isPermaLink="true">https://www.elehpd.com/blog/switching-power-supply-selection-guide</guid>
      <description>How to size a switching power supply for a control panel: headroom for inrush, derating above 40 C, single vs multi-output, and when to choose a DIN-rail or enclosed unit.</description>
      <pubDate>Sat, 19 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Photoelectric vs Inductive Sensors on a Packaging Line: How to Specify</title>
      <link>https://www.elehpd.com/blog/photoelectric-vs-inductive-sensors-packaging-line</link>
      <guid isPermaLink="true">https://www.elehpd.com/blog/photoelectric-vs-inductive-sensors-packaging-line</guid>
      <description>Choosing between diffuse, retro-reflective and through-beam photoelectric sensors and inductive proximity sensors, with the mounting and shielding rules that prevent false triggers.</description>
      <pubDate>Fri, 18 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>22 mm Panel Cut-out: A Practical Guide to Pushbuttons and Pilot Devices</title>
      <link>https://www.elehpd.com/blog/22mm-panel-cutout-pushbutton-guide</link>
      <guid isPermaLink="true">https://www.elehpd.com/blog/22mm-panel-cutout-pushbutton-guide</guid>
      <description>The 22 mm panel cut-out standard, contact configurations, momentary vs maintained operation, IP ratings on the front face, and how to specify an emergency stop correctly.</description>
      <pubDate>Thu, 17 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>Contactor Sizing for Motors: Why the AC-3 Rating Matters More Than Amps</title>
      <link>https://www.elehpd.com/blog/contactor-sizing-ac3-motor-duty</link>
      <guid isPermaLink="true">https://www.elehpd.com/blog/contactor-sizing-ac3-motor-duty</guid>
      <description>How to size a contactor for a motor using AC-1 and AC-3 utilisation categories, why the AC-3 rating is the one to quote, and how coil voltage and auxiliary contacts enter the order.</description>
      <pubDate>Wed, 16 Sep 2026 00:00:00 +0000</pubDate>
    </item>
    <item>
      <title>MCB Trip Curves: How to Choose Type B, C or D for a Circuit</title>
      <link>https://www.elehpd.com/blog/mcb-type-b-c-d-trip-curve-selection</link>
      <guid isPermaLink="true">https://www.elehpd.com/blog/mcb-type-b-c-d-trip-curve-selection</guid>
      <description>The trip ranges behind Type B, C and D miniature circuit breakers, how to check discrimination against inrush, and why 6 kA is not always enough.</description>
      <pubDate>Tue, 15 Sep 2026 00:00:00 +0000</pubDate>
    </item>
</channel>
</rss>
